project

1.signature bridge( minor project)

     summary- It uses 'incompressible' fluid which results in a greater, more efficient & consistent work or power output. This is due to the fact that hydraulic fluid molecules are able to resist compression under heavy load hence minimal energy loss is experienced and work applied is directly transferred to the actuating surfaces

2.hydraulic bridge(minor projet)

summary-The cable stayed bridge connects to National Highway 1 near existing T-point at Wazirabad on Western bank and Marginal Bund Road at Khajuri Khas on eastern bank of the river Yamuna. The deck of bridge will be composite i.e steel and concrete while pylon will be in steel.The bridge is expected to be completed in Dec 2012 and will cost around Rs 1,131 crore.

3.project plan of zero waste contruction(undergoing)