Navigation Navigation

Options

Web Content Display Web Content Display

Options

PROJECTS

The objective of this project is to provide an automatic railway gate at a level

crossing replacing the gates operated by the gatekeeper. It deals with two things.

Firstly, it deals with the reduction of time for which the gate is being kept closed.

And secondly, to provide safety to the road users by reducing the accidents .By the presently

existing system once the train leaves the station, the station master informs the gate

keeper about the arrival of the train through the telephone. Once the gatekeeper

receives the information, he closes the gate depending on the timing at which the train

arrives. Hence al, if the train is late due to certain reasons, then gate remain closed for a

long time causing traffic near the gates .By employing the automatic railway gate

control at the level crossing the arrival of the train is detected by the sensor

placed near to the gate. Hence, the time for which it is closed is less compared to the

manually operated gates and so reduces the human labour. This type of gates can be employed in

anunmanned level crossing where the chances of accidents are higher andr

eliable operation is required. Since, the operation is automatic; error due to manual

operation is

prevented.Automatic railway gate control is highly economical microcontrol

ler basedarrangement, designed for use in almost all the unmanned level crossings

in the country.